Just a few pics of what's been done so far.
Firstly Joe built a jig for the subframe, to ensure the whole thing would remain straight throughout the construction.
The sides were removed,
Donkey engine fitted for size, CG10, 998cc, Twincam, 5 speed gearbox.
Engine removed and then the frame was built up, first tacked in place and then welded.
Cross member added and here is what we had.
Tidied up the cross member weld
Electric hoists are very handy.
Snug fit.
We are waiting on Land Rover engine mounts to arrive so we can make up the mounting brackets, we also need to get a Micra CV joint to see where we are space wise between the CV and the subframe tower.
Also tight on the water pump side too.
Can't do too much now until the post man get's here with the mount.
Here is what it looks like so far.
